Posted in

What are the requirements for using a TO – Mount in aerospace systems?

If you’re deep into aerospace component sourcing (or even just someone who’s ever stared at a rocket launch and wondered how tiny parts hold up to that chaos), you’ve definitely heard of TO-Mounts. Wait—if you haven’t, TO-Mount is short for Transistor Outline Mount, right? It’s that hermetically sealed, blocky little component package you see on everything from satellite communications gear to aircraft cockpit sensors, and yeah, we’re one of the suppliers that works to make sure those little things don’t let a $200 million mission go sideways. Over the years, we’ve fielded so many calls from aerospace engineers asking, “What’s actually required for a TO-Mount to work up there?” So today, I’m breaking down the non-negotiables—no stuffy spec sheets, just real-world stuff we’ve learned working with NASA, commercial satellite teams, and military avionics folks. TO-Mount

First off, let’s talk about the big one that most new suppliers miss right out the gate: hermeticity. Aerospace? There’s no air up there that’s safe for electronics. Even low-Earth orbit has tiny micrometeoroids, solar wind, and wild pressure swings that would turn a regular plastic-packaged TO-Mount into a rusty, corroded paperweight faster than you can say “mission abort.” For context, a standard consumer TO-Mount might have a plastic seal that’s fine for a phone, but in space? That seal can leak gas at a rate that lets moisture seep in over time. That moisture freezes when you swing into Earth’s shadow, expands, and cracks the component’s internal wires.

Our team tests every TO-Mount we ship with what’s called a fine helium leak test. The requirement? A leak rate of less than 1 x 10^-8 atm cc/sec. No exceptions. We used to skip a full test on a batch once to hit a tight deadline, and got an emergency call from a customer whose satellite sensor was dying because a single TO-Mount had a leak rate of 2 x 10^-8. Total nightmare. Now, we don’t even offer partial tests for aerospace—if it’s not hermetic to that spec, it doesn’t leave our facility. That’s non-negotiable.

Next up, thermal performance. Aerospace components run hot—like, really hot. A satellite in orbit can swing from -150°C on the dark side to +120°C in direct sunlight, and the TO-Mount’s job is to move all that heat away from the tiny semiconductor chip inside. Your average off-the-shelf TO-Mount uses a lead frame made of cheap steel, but that’s garbage for aerospace because it has terrible thermal conductivity and expands way too much when it heats up. When the chip inside expands at a different rate than the mount, you get stress cracks that break the wire bonds.

So here’s the thing: for aerospace, the TO-Mount’s base plate has to be made of a material with a thermal conductivity of at least 200 W/m·K, and its coefficient of thermal expansion (CTE) has to match either the semiconductor (usually silicon or gallium arsenide) or the PCB it’s attached to. Most of our aerospace TO-Mounts use copper tungsten (CuW) or aluminum silicon carbide (AlSiC) for the base plate—those materials hit that sweet spot. We also add a thermal interface material (TIM) between the mount and the heatsink, but that’s extra. The core requirement is the base material. We had a customer last year who tried to save money on regular copper lead frames for a ground-test batch, and when they ran thermal cycling tests, 15% of the TO-Mounts failed within 100 cycles. Oops. That’s the mistake we make with aerospace: cutting corners on thermal stuff, and it bites you every time.

Then there’s mechanical ruggedness. Let’s be real, aerospace components don’t get installed on a shelf and forgotten. They’re on a rocket that’s vibrating so hard during launch that you can barely hold a screwdriver, they’re in satellites taking micrometeoroid hits, and they’re in military jets that pull 9 Gs mid-maneuver. A standard TO-Mount might survive a gentle tap, but that’s not enough here. The requirements for mechanical performance aren’t just vague “it needs to be tough”—they’re specific.

First, vibration testing: aerospace TO-Mounts have to pass random vibration of 20 g RMS from 20 Hz to 2000 Hz, plus a sine sweep of 10 to 2000 Hz at 5 g peak. We run every batch through that, no exceptions. We also test for shock: 1000 g shock pulses, 0.5 ms duration, three axes. And yes, micrometeoroid resistance. The TO-Mount’s outer shell has to be thick enough—we use a Kovar shell (that’s an iron-nickel-cobalt alloy) because it’s strong, hermetic, and CTE matches the base plate. Kovar doesn’t crack easily when hit by tiny space debris, which is way better than cheaper alloys that shatter. I’ve heard stories of a competitor’s TO-Mount cracking during a high-altitude test because they used a thinner steel shell—don’t do that.

Wait, let’s not forget about radiation hardening. Space is full of ionizing radiation: solar flares, cosmic rays, all that stuff. When those particles hit a semiconductor inside a TO-Mount, they can cause single-event effects (SEEs)—like a single-event upset (SEU) that flips a bit of data, or a single-event latchup (SEL) that fries the chip. For low-Earth orbit (LEO) satellites, that’s annoying. For deep space missions, that’s a mission killer.

So aerospace TO-Mounts can’t just be the regular industrial kind. They have to have a radiation-hardened semiconductor die inside, and the package itself has to provide at least some shielding. Our standard aerospace TO-Mounts have a Kovar shell that adds 0.5 mm of shielding, which is enough for LEO and medium Earth orbit (MEO). For deep space, we offer a reinforced version with 1 mm shell thickness and a radiation-hardened gallium arsenide (GaAs) die instead of silicon. We always ask customers where the component is going—no use overbuying shielding for a satellite that only needs LEO protection, but skimping on a Mars rover would be a death sentence. We’ve had a satellite operator come to us after a $50k batch of TO-Mounts they bought didn’t have radiation hardening, and their entire payload failed in 6 months. Now they come to us first for all their space gear.

Another thing that’s super important: material purity. You might think, “It’s just metal, how pure can it be?” But in aerospace, even tiny impurities like carbon or sulfur in the Kovar or copper can outgas when exposed to the vacuum of space. That outgassed material can condense on optical lenses, solar panels, or sensitive sensors, turning a clear lens into a foggy mess. The NASA Standard Outgassing Test (ASTM E595) is non-negotiable here. Our materials have to have a total mass loss (TML) of less than 1% and a collected volatile condensable material (CVCM) of less than 0.1%. We test every incoming batch of metal for that—no dirty metal gets turned into a TO-Mount for aerospace. I once had a supplier send us a batch of Kovar that had 0.2% CVCM, and we sent it right back. It would have contaminated a satellite’s sensor within a year, and we’re not gonna be the ones responsible for that.

Oh, and let’s talk about lead-free compliance? Wait, no—wait a second, aerospace has its own rules here, right? RoHS is for consumer electronics, but aerospace has MIL-STD specifications, like MIL-STD-750 for semiconductors. Our aerospace TO-Mounts are compliant with MIL-STD-750, MIL-STD-883, and sometimes NASA GSFC specifications, depending on the customer. A lot of new aerospace engineers will try to use regular RoHS-compliant TO-Mounts, but those don’t meet the thermal, hermetic, and radiation specs. We make sure every part we ship comes with a full spec sheet that clearly lists which standards it meets—no fine print, no surprises.

Wait, here’s a common mistake customers make: they underrating temperature cycles. Aerospace components go through thousands of temperature swings, not just a few test cycles. For example, a satellite in LEO might go from -120°C to +80°C every 90 minutes, that’s 16 cycles a day, 5840 cycles a year. So the TO-Mount has to survive at least 1000 temperature cycles from -65°C to +150°C, which is our standard. We tested a batch once that only passed 500 cycles, and we caught it before shipping—would’ve failed after a year in space. That’s the kind of quality control we do.

Now, let’s get real about cost. I know aerospace teams are on tight budgets, but cutting corners on TO-Mounts is like using a rubber band to hold up a rocket. We’ve had a customer come to us saying they saved 20% on TO-Mounts, but their satellite launch got delayed 3 months because half the parts failed testing. The extra cost for a qualified aerospace TO-Mount is nothing compared to the cost of a launch delay or a failed mission. We work with teams to find the right balance—if they’re on a tight budget for a LEO satellite, we can offer a standard MIL-TO-Mount, not the deep-space heavy-duty kind. We don’t upsell, we just give them what they need, because we know the alternative is way worse.

And let’s not forget traceability. Aerospace requires full traceability for every single part, all the way back to the raw material. If something goes wrong with a batch, you need to be able to track every TO-Mount, who made it, what materials were used, which tests it passed. Our facility has a full traceability system—every batch has a unique lot number, and we keep records of every test, every material shipment, every inspection. NASA actually audits our records sometimes, and we’ve never had a failed audit. That’s how serious we are about this.

At the end of the day, when you’re picking a TO-Mount for aerospace, it’s not just a component—it’s a critical part of the mission. You can’t just grab the cheapest off-the-shelf one and hope for the best. You need hermeticity below 1e-8 atm cc/sec, a CTE-matched high-thermal-conductivity base plate, vibration and shock resistance that meets MIL-STD, radiation hardening for the environment, outgassing compliance, and full traceability.

If you’re an aerospace engineer, procurement manager, or someone who needs TO-Mounts that work in space, aircraft, or any high-stress aerospace system, we’re the supplier you need. We’ve been doing this for over a decade, worked on everything from small CubeSats to military avionics, and can help you pick the right TO-Mount for your exact application—no jargon, no hidden fees, just parts that will keep your mission on track. Reach out to us, and we’ll walk you through everything you need.

Butterfly Laser Diode References

  1. NASA Goddard Space Flight Center. (2020). General Specification for Spacecraft Component and Material Outgassing Requirements (NASA/GSFC-STD-7000).
  2. Department of Defense. (2019). Test Method Standard for Microcircuits (MIL-STD-883H).
  3. JEDEC Solid State Technology Association. (2021). Standard Test Method for Fine Helium Leak Testing of Hermetic Solid State Devices (JEDEC JESD22-A120).
  4. Aerospace Industries Association. (2018). Guidelines for Qualification of Electronic Components for Space Applications.
  5. Copper Development Association. (2022). Thermal Performance of Electronic Packaging Materials for Aerospace Applications.

Hangzhou Brandnew Technology Co., Ltd.
Hangzhou Brandnew Technology Co., Ltd. is one of the leading to-mount manufacturers and suppliers in China, has a professional factory which manufacturers high quality to-mount and sells at competitive price. Welcome to wholesale our products made in China.
Address: 17F,Building 2, Aoqiang Mansion, No. 6 Xiyuan 5th Rd,310030 Hangzhou,China
E-mail: admin@brandnew-china.com
WebSite: https://www.brandnewdiode.com/